Beam-dump design for ISOL@MYRRHA

Quentin Noel, Donald Houngbo

    Research output

    94 Downloads (Pure)

    Abstract

    The objective of this thesis is to provide a preliminary design study of the beam-dump which will be placed after the ISOL@MYRRHA RIB-production target. Monte Carlo simulations are used to determine the spread of the proton-beam after the RIB-production target, the power deposited in the beam-dump, the isotopic inventory in the beam-dump and in the cooling water, and the required shielding around the beam-dump during operation. The geometry of the beam-dump is analyzed through successive simulations. Numerical calculations are also performed to estimate the cooling requirements.
    Original languageEnglish
    QualificationMaster of Science
    Supervisors/Advisors
    • Aït Abderrahim, Hamid, Supervisor
    • Popescu, Lucia, SCK CEN Mentor
    • Houngbo, Donald, SCK CEN Mentor
    StatePublished - 7 Sep 2016

    Cite this