Construction of the MYRRHA injector

Carmen Angulo Pérez, Jorik Belmans, Dirk Vandeplassche

    Research outputpeer-review

    Abstract

    A collaboration of SCK•CEN, IAP and BEVATECH GmbH is currently constructing the room temperature CH section of the 16.6 MeV CW proton injector for the MYRRHA project. The elaboration of all the construction readiness files for the construction of the accelerating cavities of the first CH section (1.5 to 5.9 MeV) is ongoing. In parallel, the planning, development and fabrication of all further components of this accelerator section is in progress, while the full study for the remaining section is under preparation. This contribution is documenting the most recent status.
    Original languageEnglish
    Title of host publicationProceedings of IPAC2017, Copenhagen, Denmark
    Subtitle of host publication04 Hadron Accelerators - A08 Linear accelerators
    Pages2221-2223
    Number of pages3
    DOIs
    StatePublished - 16 May 2017
    Event2017 - IPAC: 8th International Particle Accelerator Conference. - Copenhagen
    Duration: 14 May 201719 May 2017
    Conference number: TUPVA062

    Conference

    Conference2017 - IPAC
    Country/TerritoryDenmark
    CityCopenhagen
    Period2017-05-142017-05-19

    Cite this