Abstract
Commissioning required a major effort on calibration and fine setting and led to development of new functionalities. The RFPS was validated under full power and 125-mA deuteron beam loading conditions, in the radio frequency quadrupole (RFQ), demonstrating good performance. This article is an overview about how technical challenges impacted the prototype RFPS design and its functional evolution during commissioning, cavity conditioning, and beam operation of the RFQ.