Abstract
Conceptual and experimental studies on LMFBR reprocessing and reactor off-gas purification Systems are summarized. lodine sorption on zeolites, low-temperature adsorption of noble gases on charcoal and catalytic oxidation of hydrogen, simulating tritium, are being studied in laboratory set-ups. A pilot loop with 25 m3h-1 throughput has been constructed. Results are quoted from the first phase of the iodine removal programme by scrubbing systems. Further extension of the test loop, comprising off-gases conditioning prior to removal of krypton in a cryodistillation unit, has been prepared.
Delay-bed studies on 33 Xe extraction from LWR off-gases are reported.
Delay-bed studies on 33 Xe extraction from LWR off-gases are reported.
| Original language | English |
|---|---|
| Publisher | SCK CEN |
| Number of pages | 25 |
| State | Published - Jun 1975 |
Publication series
| Name | SCK CEN Reports |
|---|---|
| Publisher | SCK CEN |
| No. | BLG-502 |
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver