Abstract
The MYRRHA project borne by SCK•CEN, the Belgian Nuclear Research Centre, aims at realizing a pre-industrial Accelerator Driven System (ADS) for exploring the transmutation of long lived nuclear waste. The linac for this ADS will be a High Power Proton Accelerator delivering 2.4 MW CW beam at 600 MeV. It has to satisfy stringent requirements for reliability and availability: a beam-MTBF of 250h is targeted. The reliability goal is pursued through a phased approach. During Phase 1, expected till 2024, the MYRRHA linac up to 100 MeV will be constructed. It will allow to evaluate the reliability potential of the 600 MeV linac. It will also feed a Proton Target Facility in which radioisotopes of interest will be collected through an ISOL system; a target station for fusion studies is also foreseen. This contribution will focus on the transition to integrated prototyping, which will emphasize (i) a test platform consisting of the initial section of the normal conducting injector (5.9 MeV), (ii) the realization of a complete cryomodule for the superconducting linac and of its cryogenic valve box. The cryomodule will house two 352 MHz single spoke cavities operated at 2K.
Original language | English |
---|---|
Title of host publication | 9th International Particle Accelerator Conference |
Subtitle of host publication | IPAC2018, Vancouver, BC, Canada |
Publisher | JACoW Publishing |
Pages | 661-664 |
ISBN (Electronic) | 978-3-95450-184-7 |
DOIs | |
State | Published - Jun 2018 |
Event | 2018 - IPAC'18: 9th International Particle Accelerator Conference - JW Marriott Parq Vancouver, Vancouver, BC Duration: 30 Apr 2018 → 4 May 2018 https://ipac18.org/ |
Conference
Conference | 2018 - IPAC'18 |
---|---|
Country/Territory | Canada |
City | Vancouver, BC |
Period | 2018-04-30 → 2018-05-04 |
Internet address |