TY - GEN
T1 - MYRRHA accelerator driven sytem programme
T2 - Recent progress and perspectives
AU - Aït Abderrahim, Hamid
AU - De Bruyn, Didier
AU - Dierckx, Marc
AU - Fernandez, Rafaël
AU - Popescu, Lucia
AU - Schyns, Marc
AU - Stankovskiy, Alexey
AU - Van den Eynde, Gert
AU - Vandeplassche, Dirk
N1 - Score=3
PY - 2019
Y1 - 2019
N2 - The purpose of the MYRRHA programme is to demonstrate the ADS concept at pre-industrial scale, to prove the transmutation efficiency in ADS and to serve as a flexible and multipurpose irradiation facility. The MYRRHA sub-critical core fueled with highly enrichedMOX fuel and cooled with LBE will be operated by a high-power superconducting linear accelerator delivering a proton beam of 600 MeV, 4 mA to an LBE spallation target. In September 2018, the Belgian government has approved the construction of the MYRRHAfacility and its operation until 2038. In this paper, we describe the present status of the MYRRHA programme and the perspectives for implementation through a first infrastructure in 2026 to the full MYRRHA operation in 2036.
AB - The purpose of the MYRRHA programme is to demonstrate the ADS concept at pre-industrial scale, to prove the transmutation efficiency in ADS and to serve as a flexible and multipurpose irradiation facility. The MYRRHA sub-critical core fueled with highly enrichedMOX fuel and cooled with LBE will be operated by a high-power superconducting linear accelerator delivering a proton beam of 600 MeV, 4 mA to an LBE spallation target. In September 2018, the Belgian government has approved the construction of the MYRRHAfacility and its operation until 2038. In this paper, we describe the present status of the MYRRHA programme and the perspectives for implementation through a first infrastructure in 2026 to the full MYRRHA operation in 2036.
KW - Accelerator driven system
KW - Lead-bismuth
KW - Superconducting linear accelerator
UR - https://ecm.sckcen.be/OTCS/llisapi.dll/overview/42710357
U2 - 10.26583/npe.2019.2.03
DO - 10.26583/npe.2019.2.03
M3 - In-proceedings paper
T3 - Nuclear Power Engineering Ru
SP - 1
EP - 13
BT - Nuclear Power Engineering
ER -