MYRRHA accelerator driven sytem programme: Recent progress and perspectives

    Research outputpeer-review

    Abstract

    The purpose of the MYRRHA programme is to demonstrate the ADS concept at pre-industrial scale, to prove the transmutation efficiency in ADS and to serve as a flexible and multipurpose irradiation facility. The MYRRHA sub-critical core fueled with highly enrichedMOX fuel and cooled with LBE will be operated by a high-power superconducting linear accelerator delivering a proton beam of 600 MeV, 4 mA to an LBE spallation target. In September 2018, the Belgian government has approved the construction of the MYRRHAfacility and its operation until 2038. In this paper, we describe the present status of the MYRRHA programme and the perspectives for implementation through a first infrastructure in 2026 to the full MYRRHA operation in 2036.
    Original languageEnglish
    Title of host publicationNuclear Power Engineering
    Pages1-13
    Number of pages13
    DOIs
    StatePublished - 2019

    Publication series

    NameNuclear Power Engineering Ru
    Volume2
    ISSN (Print)0204-3327

    Cite this