TY - GEN
T1 - THE MYRRHA ADS project in Belgium enters the Front End Engineering Phase
AU - De Bruyn, Didier
AU - Aït Abderrahim, Hamid
AU - Baeten, Peter
AU - Leysen, Paul
N1 - Score = 3
PY - 2015/6
Y1 - 2015/6
N2 - The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a MTR, based on the ADS concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the principle of the ADS. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the mean time we have made some refinements in both primary systems and plant layout, including reactor building design. In this paper, we present the most recent developments of the MYRRHA design in terms of reactor building and plant layout as existing today.
AB - The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a MTR, based on the ADS concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the principle of the ADS. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the mean time we have made some refinements in both primary systems and plant layout, including reactor building design. In this paper, we present the most recent developments of the MYRRHA design in terms of reactor building and plant layout as existing today.
KW - ADS
KW - transmutation
KW - irradiation facility
UR - http://ecm.sckcen.be/OTCS/llisapi.dll/open/ezp_140098
UR - http://knowledgecentre.sckcen.be/so2/bibref/12858
M3 - In-proceedings paper
VL - 1
T3 - Nuclear Science
SP - 220
EP - 227
BT - 13th Information Exchange Meeting on Actinide & Fission Products Partitioning & Transmutation (13IEMPT)
CY - France
T2 - IEMPT 13 - 13th Information Exchange Meeting on Actinide and Fission Product Partitioning and Transmutation
Y2 - 23 September 2014 through 26 September 2014
ER -