Abstract
The BR2 reactor was shut down end of June 1995 for an extensive refurbishement after more than 30 years utilization. The beryllium matrix will be replaced and the aluminum vessel inspected for an envisaged 15 year life extension. Other aspects of the refurbishment program aim reliability and availability of the installations, safety of operation and compliance with modern safety standards. The overall objective is to get the reactor operational early 1997. This 18 months refurbishment period allows an extensive re-qualification and upgrading of the existing irradiation devices. Several new irradiation devices are studied in order to satisfy future irradiation demands
Original language | English |
---|---|
Title of host publication | Proceedings of the 5th Asian symposium on research reactors |
Place of Publication | Yosung |
Publisher | Korean Atomic Energy Institute |
Chapter | A1-2 |
Pages | 69-76 |
Number of pages | 8 |
Volume | 1 |
ISBN (Print) | 978-981-07-2518-1 |
State | Published - 29 May 1996 |
Event | 1996 - 5th Asian Symposium on Research Reactors - Taedok Lotte Hotel, Taejon Duration: 29 May 1996 → 31 May 1996 |
Conference
Conference | 1996 - 5th Asian Symposium on Research Reactors |
---|---|
Country/Territory | Korea, Republic of |
City | Taejon |
Period | 1996-05-29 → 1996-05-31 |