Abstract
An assessment based on three methodologies was made of the proliferation risks of the MYRRHA ADS in comparison with the BR2 MTR, an existing research reactor at the Belgian Nuclear Research Centre SCK•CEN. The used methodologies were the TOPS, the PR&PP and the INPRO methodologies. The various features of the methodologies are described and the results of the assessments are given and discussed. It is concluded that it would be useful to define one single methodology with two options to perform a quick and a more detailed assessment.
Original language | English |
---|---|
Title of host publication | Proceedings of the 7th ESARDA-INMM Workshop (on CD) |
Place of Publication | France |
Pages | 1-8 |
State | Published - Oct 2011 |
Event | 2011 - 7th ESARDA/INMM Joint Workshop - Aix en Provenve Duration: 16 Oct 2011 → 20 Oct 2011 https://esarda.jrc.ec.europa.eu/index.php?option=com_content&view=article&id=47&Itemid=243 |
Workshop
Workshop | 2011 - 7th ESARDA/INMM Joint Workshop |
---|---|
Country/Territory | France |
City | Aix en Provenve |
Period | 2011-10-16 → 2011-10-20 |
Internet address |